EC Verification of the Mezdra – Medkovec railway line
On 25.04.2024, in the city of Sofia, between the National Railway Infrastructure Company, in its capacity of an Employer,... read more
Participation in an ERTMS 2024 Conference
From 23th to 25th of April 2024, eng. Denitsa Kireva-Mihova, PhD - Chief expert-assessor and eng. Marina Evtimova -... read more
EC Verification of the Traction Substation Boychinovci
On 26.01.2024, in the city of Sofia, between "KMC" EAD, in its capacity of an Employer, and “TINSA” Ltd... read more
Training for the Staff of TINSA Ltd. 16 – 17 June 2012
On 16 and 17 June 2012 in Novotel Plovdiv a training was held for the staff of TINSA Ltd.... read more
Participation in an International Forum
On 16.11.2015 General Manager of TINSA Ltd. Assoc. Prof. PhD Eng. Nelly Stoytcheva participated in an International Forum "Cooperation... read more
EC verification of signaling systems
On August 22nd, 2013, an application has been received in the Notified body/ Designated body TINSA and a contract... read more
TINSA Ltd. has obtained the statute of Notified Body
On 12 June 2012 TINSA Ltd. has obtained the statute of Notified Body NB 2387 in the NANDO (New... read more
EC Verification of the ETCS for the Ruse – Kaspichan railway line
On 02.09.2024, in the city of Sofia, between the National Railway Infrastructure Company, in its capacity of an Employer,... read more
Training of the personnel of TINSA Ltd. June 4-5, 2011
On June 4 and 5, 2011, in Sliven, a training course was held for the assessing personnel of TINSA... read more
EC Verification of the Traction Substation Ruse
On 28.11.2023, in the city of Sofia, between "Alokor" EAD, in its capacity of an Employer, and “TINSA” Ltd... read more