WE MAKE INTEROPERABILITY VISIBLE

News

Back to News

EC Verification of the Traction Substation Ruse


On 28.11.2023, in the city of Sofia, between “Alokor” EAD, in its capacity of an Employer, and “TINSA” Ltd (Contractor), was signed a contract, with subject: EC Conformity Verification of the Traction Substation Ruse, part of the subsystem Energy.

Share this post

Back to News