Related Posts
EC Verification of the railway link between Burgas railway station and Burgas airport
On 21.05.2024, in the city of Sofia, between the National Railway Infrastructure Company, in its capacity of an Employer,... read more
EC Verification of the ETCS for the Ruse – Kaspichan railway line
On 02.09.2024, in the city of Sofia, between the National Railway Infrastructure Company, in its capacity of an Employer,... read more
Participation in an ERTMS 2024 Conference
From 23th to 25th of April 2024, eng. Denitsa Kireva-Mihova, PhD - Chief expert-assessor and eng. Marina Evtimova -... read more
Participation in InnoTrans 2024
During the period September 25-27, 2024 in the city of Berlin exhibition center Messe Berlin, representatives of "TINSA" Ltd.... read more
EC Verification of the Traction Substation Boychinovci
On 26.01.2024, in the city of Sofia, between "KMC" EAD, in its capacity of an Employer, and “TINSA” Ltd... read more
Training for the Staff of TINSA Ltd. 16 – 17 June 2012
On 16 and 17 June 2012 in Novotel Plovdiv a training was held for the staff of TINSA Ltd.... read more
TINSA Ltd. has obtained the statute of Notified Body
On 12 June 2012 TINSA Ltd. has obtained the statute of Notified Body NB 2387 in the NANDO (New... read more
EC Verification of the upgraded GSM-R system
On 12.04.2024, in the city of Sofia, between the National Railway Infrastructure Company, in its capacity of an Employer,... read more
EC verification of signaling systems
On August 22nd, 2013, an application has been received in the Notified body/ Designated body TINSA and a contract... read more
Member of a Bulgarian – Turkish Trade-Industrial Chamber
On 11.04.2022 TINSA Ltd. became a member of a Bulgarian - Turkish Trade-Industrial Chamber. read more
